PPL Shipyard – Construction of Toilet
Construction of Toilet
PPL Shipyard
We excavated and laid sanitary plumbing before casting a concrete foundation over the designated area.
The shelter was erected with steel structures and covered with zinc roof sheets.
Brick walls and cubicles were erected and fittings, accessories installed.